The average concrete project in Sunrise, FL costs between $4,450 and $9,450 depending on project type, size, and finish.

Standard Driveway $11/sqft
Stamped Concrete $16/sqft
Patio $12/sqft
Asphalt Driveway $7/sqft

Concrete Cost by Project Size in Sunrise

Project Size (sqft) Standard Driveway Stamped Concrete Concrete Patio
200 sq ft$2,250$3,150$2,350
400 sq ft$4,550$6,300$4,700
600 sq ft$6,800$9,450$7,100
800 sq ft$9,050$12,600$9,450
1,000 sq ft$11,300$15,750$11,800

Frequently Asked Questions

How much does concrete work cost in Sunrise?

Typical concrete work in Sunrise runs $4,450 to $9,450, depending on scope, materials, and finish level. Labor costs in Sunrise track within a few points of the national average for concrete work, so material selection and project scope are the bigger pricing levers for homeowners.

What sets concrete work pricing apart in Sunrise?

Concrete work pricing in Sunrise tracks within a few percent of the national average. Labor costs in Sunrise track within a few points of the national average for concrete work, so material selection and project scope are the bigger pricing levers for homeowners. Sunrise's relatively young housing stock (31 years average) simplifies most concrete work projects. Modern code compliance, standard dimensions, and accessible construction reduce both time and cost versus older homes.

How does Sunrise's humidity affect concrete mix and prep choice?

Given Sunrise's humidity: Homes in Sunrise averaging 31 years old typically have stable sub-grades that simplify concrete work. New pours integrate cleanly with existing slabs and foundations without the settling corrections older properties need.

What red flags should I watch for hiring a concrete contractor in Sunrise?

Be cautious of concrete work contractors in Sunrise who pressure you to sign same-day. Legitimate contractors expect you to get competing bids and will hold their price for 30 days. High-pressure sales tactics correlate with inflated pricing. Any Sunrise contractor who asks for more than 30% upfront before materials are ordered is a red flag. Standard practice is 10-15% deposit, materials-on-delivery payment, and final payment on completion.