Concrete & Driveway Cost in Savannah, GA

The average concrete project in Savannah, GA costs between $4,200 and $9,000 depending on project type, size, and finish.

Standard Driveway $11/sqft
Stamped Concrete $15/sqft
Patio $11/sqft
Asphalt Driveway $7/sqft

Concrete Cost by Project Size in Savannah

Project Size (sqft) Standard Driveway Stamped Concrete Concrete Patio
200 sq ft$2,150$3,000$2,250
400 sq ft$4,300$6,000$4,500
600 sq ft$6,450$9,000$6,750
800 sq ft$8,600$11,950$9,000
1,000 sq ft$10,750$14,950$11,200

Frequently Asked Questions

How much does concrete work cost in Savannah?

Savannah homeowners usually budget $4,200 to $9,000 for concrete work, depending on scope, materials, and finish level. Labor costs in Savannah track within a few points of the national average for concrete work, so material selection and project scope are the bigger pricing levers for homeowners.

Why do concrete work costs vary in Savannah?

Concrete work costs in Savannah land near the middle of the US range. Labor costs in Savannah track within a few points of the national average for concrete work, so material selection and project scope are the bigger pricing levers for homeowners. At 45 years average home age, Savannah properties are hitting their first major replacement cycle for systems and components. concrete work demand is at peak levels in this age band, which keeps contractor schedules full but pricing competitive.

How does Savannah's humidity affect concrete mix and prep choice?

Given Savannah's humidity: Older properties in Savannah (averaging 45 years) often have settling concrete that affects drainage. Re-pouring may require sub-grade correction (compaction, drainage tile) that new construction doesn't need. Budget 10-20% extra for site preparation on established properties.

What red flags should I watch for hiring a concrete contractor in Savannah?

Be cautious of concrete work contractors in Savannah who pressure you to sign same-day. Legitimate contractors expect you to get competing bids and will hold their price for 30 days. High-pressure sales tactics correlate with inflated pricing. Any Savannah contractor who asks for more than 30% upfront before materials are ordered is a red flag. Standard practice is 10-15% deposit, materials-on-delivery payment, and final payment on completion.