Paver Patio Cost by Size in Pasadena
| Project Size (sqft) | Paver Patio | Retaining Wall | Sod Installation |
|---|---|---|---|
| 200 sq ft | $4,400 | $7,300 | $300 |
| 400 sq ft | $8,750 | $14,600 | $600 |
| 600 sq ft | $13,150 | $21,900 | $900 |
| 800 sq ft | $17,550 | $29,200 | $1,150 |
| 1,000 sq ft | $21,900 | $36,550 | $1,450 |
Other Landscaping Costs in Pasadena
| Service | Typical Range |
|---|---|
| Landscape Design + Install | $4,850 - $14,600 |
| French Drain | $1,200 - $2,450 |
| Grading/Leveling | $950 - $2,900 |
Frequently Asked Questions
How much does landscaping work cost in Pasadena?
Typical landscaping work in Pasadena runs $5,850 to $11,650, depending on scope, materials, and finish level. With Pasadena labor rates near the national median, the cost difference between a budget and premium full yard makeover comes down to materials and scope rather than labor premiums.
What sets landscaping work pricing apart in Pasadena?
Landscaping work pricing in Pasadena tracks within a few percent of the national average. With Pasadena labor rates near the national median, the cost difference between a budget and premium full yard makeover comes down to materials and scope rather than labor premiums. Pasadena's housing stock averages 36 years — the age where original installations start failing and code requirements have evolved. Most landscaping project quotes will include some code-catch-up items that newer homes wouldn't need.
How does Pasadena's humidity affect plant and hardscape plan choice?
Given Pasadena's humidity: A complete landscaping project in Pasadena typically breaks down as: plant material (30-40%), hardscape/materials (20-30%), labor (25-35%), and design (5-10%). For budget-conscious homeowners, phasing the project over 2-3 seasons lets plants establish naturally and reduces upfront costs.
What pitfalls should I watch for hiring a landscaper in Pasadena's HOA neighborhoods?
Be cautious of landscaping project contractors in Pasadena who pressure you to sign same-day. Legitimate contractors expect you to get competing bids and will hold their price for 30 days. High-pressure sales tactics correlate with inflated pricing. Any Pasadena contractor who asks for more than 30% upfront before materials are ordered is a red flag. Standard practice is 10-15% deposit, materials-on-delivery payment, and final payment on completion.

