Concrete Cost by Project Size in New Brunswick
| Project Size (sqft) | Standard Driveway | Stamped Concrete | Concrete Patio |
|---|---|---|---|
| 200 sq ft | $2,650 | $3,650 | $2,750 |
| 400 sq ft | $5,300 | $7,350 | $5,500 |
| 600 sq ft | $7,900 | $11,000 | $8,250 |
| 800 sq ft | $10,550 | $14,700 | $11,000 |
| 1,000 sq ft | $13,200 | $18,350 | $13,800 |
Frequently Asked Questions
How much does concrete work cost in New Brunswick?
Concrete work costs in New Brunswick run above national norms — most homeowners spend $5,150 to $11,000, depending on scope, materials, and finish level. The biggest factor in New Brunswick concrete work pricing is labor cost, running 32% above national benchmarks.
Why is concrete work more expensive in New Brunswick?
Concrete work in New Brunswick runs roughly 21% above the national average. The biggest factor in New Brunswick concrete work pricing is labor cost, running 32% above national benchmarks. For a driveway or patio pour, that premium alone accounts for $1280-2560 in additional cost. The 57-year average home age in New Brunswick means most concrete work projects encounter at least one behind-the-wall surprise. Experienced local contractors price this risk in; lowball bids from out-of-area contractors often don't.
What concrete mix and prep works best in New Brunswick?
For a New Brunswick home: Standard concrete in New Brunswick runs $6-10 per square foot for basic flatwork (driveways, walkways). Decorative options (stamped, colored, exposed aggregate) add $4-8 per square foot. The biggest hidden cost is demolition and removal of existing concrete — budget $2-4 per square foot for tearout of old slabs.
What red flags should I watch for hiring a concrete contractor in New Brunswick?
Be cautious of concrete work contractors in New Brunswick who pressure you to sign same-day. Legitimate contractors expect you to get competing bids and will hold their price for 30 days. High-pressure sales tactics correlate with inflated pricing. Any New Brunswick contractor who asks for more than 30% upfront before materials are ordered is a red flag. Standard practice is 10-15% deposit, materials-on-delivery payment, and final payment on completion. In New Brunswick, concrete work on homes over 46 years old should include a contingency line item (10-15% of total). Contractors who guarantee fixed pricing on old-home work either haven't looked closely enough or plan to cut corners when surprises appear.

