Landscaping & Hardscape Cost in Joliet, IL

The average landscaping project in Joliet, IL costs between $7,800 and $15,500 depending on project type, size, and materials.

Paver Patio $29/sqft
Retaining Wall $48/sqft
Sod Install $2/sqft
Full Design + Install $12,950

Paver Patio Cost by Size in Joliet

Project Size (sqft) Paver Patio Retaining Wall Sod Installation
200 sq ft$5,800$9,700$400
400 sq ft$11,650$19,400$800
600 sq ft$17,450$29,100$1,150
800 sq ft$23,250$38,800$1,550
1,000 sq ft$29,100$48,500$1,950

Other Landscaping Costs in Joliet

ServiceTypical Range
Landscape Design + Install$6,450 - $19,400
French Drain$1,600 - $3,250
Grading/Leveling$1,300 - $3,900

Frequently Asked Questions

How much does landscaping work cost in Joliet?

Landscaping work costs in Joliet run above national norms — most homeowners spend $7,800 to $15,500, depending on scope, materials, and finish level. Labor is the dominant cost driver for landscaping project in Joliet — local wages run 47% above the national average, which adds 24% or more to a typical full yard makeover.

Why is landscaping work more expensive in Joliet?

Landscaping work in Joliet runs roughly 30% above the national average. Labor is the dominant cost driver for landscaping project in Joliet — local wages run 47% above the national average, which adds 24% or more to a typical full yard makeover. Joliet's housing stock averages 43 years — the age where original installations start failing and code requirements have evolved. Most landscaping project quotes will include some code-catch-up items that newer homes wouldn't need.

How does Joliet's winter climate affect plant and hardscape plan selection?

In Joliet's cold-climate market: A complete landscaping project in Joliet typically breaks down as: plant material (30-40%), hardscape/materials (20-30%), labor (25-35%), and design (5-10%). For budget-conscious homeowners, phasing the project over 2-3 seasons lets plants establish naturally and reduces upfront costs.

What red flags should I watch for hiring a landscaper in Joliet?

Any Joliet contractor who asks for more than 30% upfront before materials are ordered is a red flag. Standard practice is 10-15% deposit, materials-on-delivery payment, and final payment on completion. Watch for landscaping project quotes in Joliet that lack line-item detail. A professional estimate breaks out labor, materials, permits, and cleanup separately. Lump-sum bids hide margin and make change orders impossible to evaluate.