Slate the Concrete Woogoro

Concrete & Driveway Cost in Beaverton, OR

The average concrete project in Beaverton, OR costs between $5,400 and $11,500 depending on project type, size, and finish.

Standard Driveway $14/sqft
Stamped Concrete $19/sqft
Patio $14/sqft
Asphalt Driveway $9/sqft

Concrete Cost by Project Size in Beaverton

Project Size (sqft) Standard Driveway Stamped Concrete Concrete Patio
200 sq ft$2,750$3,850$2,900
400 sq ft$5,500$7,650$5,750
600 sq ft$8,250$11,500$8,650
800 sq ft$11,050$15,350$11,500
1,000 sq ft$13,800$19,200$14,400

Frequently Asked Questions

How much does concrete work cost in Beaverton?

Concrete work costs in Beaverton run above national norms — most homeowners spend $5,400 to $11,500, depending on scope, materials, and finish level. The biggest factor in Beaverton concrete work pricing is labor cost, running 32% above national benchmarks.

Why is concrete work more expensive in Beaverton?

Concrete work in Beaverton runs roughly 18% above the national average. The biggest factor in Beaverton concrete work pricing is labor cost, running 32% above national benchmarks. For a driveway or patio pour, that premium alone accounts for $1280-2560 in additional cost. Newer construction in Beaverton (averaging 32 years) means concrete work projects rarely encounter the hidden-scope surprises common in older markets. What you see in the quote is usually what you pay.

What concrete mix and prep works best in Beaverton?

For a Beaverton home: Homes in Beaverton averaging 32 years old typically have stable sub-grades that simplify concrete work. New pours integrate cleanly with existing slabs and foundations without the settling corrections older properties need.

What red flags should I watch for hiring a concrete contractor in Beaverton?

Be cautious of concrete work contractors in Beaverton who pressure you to sign same-day. Legitimate contractors expect you to get competing bids and will hold their price for 30 days. High-pressure sales tactics correlate with inflated pricing. Any Beaverton contractor who asks for more than 30% upfront before materials are ordered is a red flag. Standard practice is 10-15% deposit, materials-on-delivery payment, and final payment on completion.